Industrial wastewater treatment plan — reuse via membrane elements
Not an available product
This sheet documents a project case or a performance figure declared by the provider. It does not represent equipment available to quote directly; it is shown as supporting technical context.
Application as described by the provider
High-quality reuse of industrial wastewater at lower cost, via membrane elements; modular design to reduce construction time, per the document.
Documented capacity and process
Declared process per flow diagram (p. 14): wastewater discharge → sand filtration → ultrafiltration (UF, ≈90%) → reverse osmosis (RO, 60–70%) → ion-exchange resin (≈95%) → demineralized water (DMW) tank. Reference flows in the diagram: sedimentation 26,530 CMD; UF 26,000 CMD; RO permeate 4,500 CMD; UPW 9,000 CMD (flow-diagram figures, not confirmed as real installed capacity).
Figures declared by the provider
- Declared reduction in total wastewater-resource project budget: 15%
- Declared reduction in membrane system fouling-blockage risk: 80%, via advanced pretreatment technology
- NaCl concentration the high-pressure membrane system can reportedly increase to: up to 10% (100K TDS)
- Declared maintenance efficiency improvement from modular design: 30%
- None of these figures have an identified reference project or documented test conditions.
- These figures do not constitute a guarantee applicable to your project without an independent technical evaluation.
Document: Ficha técnica — Fuente A (Fuente A) — Page p. 13–14.
Technical catalog from a technology provider. The provider's commercial name and legal entity are kept in ALLIANCE's private registry and are not published on this site. Use of this material has confirmed authorization; illustrative images accompanying some sheets are generated and are not photographs of the actual equipment.
This sheet summarizes information provided by the supplier in the cited document. ALLIANCE does not manufacture this equipment, does not confirm inventory or availability, and does not guarantee the technology is suitable for your application without a technical review. Final configuration and proposal are determined project by project.